MiXi Environmental Dynamics | New Product Release/Technological Breakthrough/Industry Certification for Fabric Ducts

All News

All News Company News Industry News notice

Application of MultiXAir Fabric Ducts in a Philippine Auditorium Project

Application of MultiXAir Fabric Ducts in a Philippine Auditorium Project ...

Date:2026/11/18

Shandong General Warehouse Project

Based on the building’s architectural characteristics and air supply requirements, the system was selected using the patented MX3.0 design software, and CFD technology was employed to simulate airflow patterns within the space. The specific design is as follows: ...

Date:2026/8/14

Fabric Ducting Design Guide for 2026

As HVAC technology evolves in 2026, building owners and engineers are increasingly moving away from traditional galvanized steel in favor of Fabric Ducting Systems. This shift is driven by the need for superior air distribution, hygiene standards, and cost-efficiency. ...

Date:2026/4/9

SABER/SASO Registered Fabric Air Ducting: Trusted Supplier for Saudi Arabia & UAE

As a leading global provider, As a leading global provider, MultiXair specializes in high-quality fabric air ducting systems that are fully SABER/SASO registeredSABER/SASO registered, ensuring a seamless entry into the Gulf market and unmatched reliability for your projects. ...

Date:2026/1/27

Project Case Study: MX Fabric Ducting in Food Cold Storage

The Zhangzhou Fengrun Food Cold Storage Project features a panel-structured warehouse primarily composed of raw material storage areas. With a warehouse height of 11.2 meters and a cold room temperature of -23°C, this project employs three air coolers integrated with MultiXair fabric ducting to cool the interior. This configuration addresses airflow organization within the warehouse, ensuring precise control of temperature and humidity for stored goods. ...

Date:2025/12/12

MultiXair Fabric Ducting Powers Changkaisheng Cold Chain Logistics Base

The Changkai Sheng Cold Chain Logistics Base project comprises two buildings, each with six stories and a warehouse height of 39.595 meters. Each floor utilizes four air coolers paired with MX fabric ducting to cool the warehouse interior, addressing airflow organization issues and ensuring precise temperature and humidity control for stored goods. ...

Date:2025/11/20
More
X

Take a screenshot and scan the QR code with WhatsApp.

WhatsApp ID:8615002133570

(Click on the WhatsApp ID to copy it and add the friend.)

The WhatsApp ID has been copied. Please open WhatsApp and add it to consult for details!